Unibridges

Made of beam elements 11.40m and 6.10m long, assembled lengthwise by pins and transversally by spacers, the UNIBRIDGE® is entirely modular.

Image 1
  • Image 1
DESCRIPTION

It is possible to construct bridges with multiple spans. At this time, the maximum length between two bridge bearings is approximately 57 metres.

It can be erected within very short notice using small erection teams: 6 staff members assemble a 45m span in 12 hours. UNIBRIDGE® structures are supplied with the whole range of components needed for the implementation, and come with an assembly manual specifying the identification, marking and weight of each part.

Its transversal modularity allows the UNIBRIDGE® to increase its carriageway’s width, anytime during the structure’s lifetime, by adding extra beams. It may also be dismantled and reassembled elsewhere if the user wishes.